Hertel

Floor coat replacement in Galley and 4 cabins of Citadel

Caspian Universal Suppliers

Maintenance of Dada Gorgud and Istiglal

Hertel

R/c foundation construction for steel structure at BOS Shelf

Hertel

Upgrade of central tween-deck on DB “Azerbaijan”

CODEST S.R.L.

Cleaning & refurbishment of four story bldg.

Swift Engineering

Outfitting works at the accommodation area of Istiglal

MCG Kazakhstan

Construction of housing with trade centre in Aktau

Azeri Profile

Outfitting, electrical and mechanical works at WWPS facility

Caspian Support Solution (CSS)

Installation of HVAC system in the kitchen at BOS Shelf yard

Swift Engineering

Door installation, lighting, ceiling, internal wall cladding in 20’ containers for offshore

Star Gulf

Design, fabrication and installation of VIP viewing room and access stairway

SGB Denholm (SDL-KBR)

Installation of 1.8 m of subterranean 16’ pipe to include road crossing for crude oil BTC pipeline

Caspian Support Solutions (CSS)

Design, erection and outfitting of two prefabricated structures at BOS Shelf facility

SGB Denholm Ltd

Installation of 300+ reinforced concrete plinth for pipelines at Sangachal. BP permit to work system application

Star Gulf

Upgrade of the rigging office & W/H office center at BOS Shelf in 2004

SBG Denholm Ltd.

Supplied welders, fitters, platers and super-n at the construction phase of Neftgaz vessel and maint-ce of Chirag offshore installation

SBG Denholm Ltd.

Installation of the reinforced concrete pads for steam generators and diesel tanks at Sangachal